500KV Vung Ang Switchyard of Vung Ang 1 Thermal Power Plant

500KV Vung Ang Switchyard of Vung Ang 1 Thermal Power Plant 

Investor                        : Petro Vietnam (PVN)

Main Contractor   : VINAINCON-PECC1-BDCC CONSORTIUM (Vietnam Industrial Construction Corporation -

No.1 Power engineer consulting JSC - Bach Dang Construction Corporation.

Contract Value             : 30,292,000 USD

Capacity                       : 2x600 MW

Period                           : 2012-2014

Work Scope                  : Survey, design and services.

- BDCC: outdoor civil works.

- VINAINCON - Procurement, construction, installation, testing and commissioning


content-img.png



SPP Vung Ang2.jpg


IMG_3715.JPG


IMG_3709.JPG


IMG_3723.JPG


photo7.jpg